Our responsibilities: Relocate existing canteen above mezzanine floor within a healthcare facility. 

Project Outline: Removal of existing ground floor canteen and reinstate on top of mezzanine floor, we also installed a 1 hour fire protection to the underside of the mezzanine floor and supplied and installed all electrical and flooring requirements 

Location: Droitwich

Duration: 2 weeks

 